Oak Drive Bridge Replacement

Project Summary
The Oak Drive Bridge over Two-Mile Creek is scheduled for replacement in 2018.  The City obtained a federal grant, by which 80% of the costs will be reimbursed. 

Project Update and Schedule

This project bid on 3/2/18, and the low bidder was Kozeny-Wagner.  The Board of Alderman has approved the contract, contingent upon MoDOT Concurrence in Award. Closure of the existing bridge and demolition are scheduled to start right after Memorial Day.

Last updated 3/14/18