2023 Capital Improvement Projects

Street and Sidewalk Projects

Cracksealing-West "half" of city: BIDS 2/2
Sidewalk Replacements (Dougherty Ridge/Woods): BIDS 2/21

Greenbriar Estates Cul-de-sac Reconstruction  BIDS 2/21

Bent Brook Road Slab Replacements  BIDS 2/21

Street Resurfacing (Apple Hill and part of Harwood Hills) DESIGN

Microsurfacing (Old Dougherty Ferry, Bellerosa, Westmark, Movie, Sateen, and part of Highland) DESIGN

Ballas Road (St. Louis County Project)

Manchester Road Improvements  (MoDOT project: 2022-2024)


Future Major Projects

(Federal grants)

Des Peres Road Roundabout  DELAYED INDEFINITELY
Lindemann Road Resurfacing (2024 Construction)



Facility

Building Improvements and New Building (2023 Design, 2024 Construction)


Equipment


Miscellaneous Small Equipment (trimmers, chainsaws, blowers, etc.)

Replace 3/4T pickup ORDERED

Replace 2T dump truck: ORDERED

Replace Bobcat skid-steer: ORDERED

Replace Asphalt Roller: DELIVERED 1/20/23

Replace Air Compressor: ORDERED

Replace Wood Chipper: ORDERED

Last updated 1/27/23


Manchester Corridor Study (East of Ballas)


 This study started in 2016 and was completed in 2017.  Presentations were given to the Board of Aldermen during a work session and to the Planning & Zoning Commission during a regular meeting.  Having this study in place put the City in an excellent position to compete for federal project funding in the future, and provides a template to both MoDOT and developers. In 2018, the City was awarded a grant to complete pedestrian upgrades in conjunction with MoDOT's planned 2022 reconstruction of Manchester Road.
Final Report

Presentations Slides


Street Repairs Coming Soon